Day Five - 09.03.09

The floor coverered with our sifted rubble - in preparation for the new floor.

The putting up of the new plasterboard ceiling.
Day Four - 08.03.09

Martin offering Lorna some drilling advice.

Scenes of sublime madness - 18 people descended on CW today - sifting rubble through an old shopping trolley.
Day Three - 07.03.09

Burning off the old with Ian & Javi

Made a start drilling up part of the old concrete to make way for the new floor.
Day Two - 06.03.09

Touchdown! we got to the bottom of the big pit and starting working south! The rubble is getting used as hardcore to go under the new concrete floor.

Alex in the new outside space at the back (soon to be the wood workshop).
-----
Day One - 05.03.09

The big pit was opened and we started digging out the rubble for use in our new floor.

Javi and John take down the tumble-down space to make way for our new wood-workshop